Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com
Depending on the rules of your GRC, choose one of the two exercises below. If you are competing in Falling Walls, you are allowed both slides and a prop. For most other GRCs, it is either one or the other.
A) Develop a draft slide(s) for your GRC talk following the best practices discussed in the section Designing a Good Slide(s). In this exercise, you will draft your initial ideas for your slide. At this point, developing several options for your slide is fine, and is even a good idea. The variety will give you choices to share with your test audiences who can help you think about what the final slide should (and should not) include.
B) Brainstorm a prop(s) for your GRC talk and make a plan for using it during your talk. Consider the following questions and narrow your choice of props down to two. Then, walk through a plan of how you will use each of them, to help you determine which of them is best. Answer these questions:
As you answer these questions, one option will hopefully emerge as the better choice.
In this revision of your script, consider adding subheadings or questions to make sure you are capturing the key ideas that need to be present. Potential subheadings could be:
Please note that these subheadings are for your use. You would not verbalize them in your talk.
Iris Garcia-Pak, winner of the 2024 University of California Grad Slam, reported that some of the best feedback she got was when a judge asked her, “Why is your research interesting?”.
I pose that same question to you now: Why is your research interesting? Why is it important?
If you need a little inspiration, look at the energy of the man in the photo to the left. He has just discovered a new element and he cannot wait to tell you ALL about it. Can you capture his enthusiasm and conviction to tell us about your work? Of course you can!

In this round of videos, your focus should be on the slides and props. Focusing your attention may be slightly challenging because you will notice that the camera is usually on the speaker. You may need to pause the video to analyze the slide(s)/prop(s).
Use the fillable PDF GRC Talk Observation Worksheet or the online version to capture your reactions.
Suggested talks for effective slides:
Suggested talks for effective props:

Our main progress this week was on your supporting slide and/or prop. You should have a rough idea of the type of content you want to include on the slide, and/or what type of prop you want to use. (If you already know which prop you are using, consider yourself 75% done on that part!)
You also spent some time reviewing your script, perhaps starting to think about how to leverage your slide or prop while delivering your GRC talk.
Remember to notice your vocal character and considering how to optimize it for your GRC talk.